HULU GANGA PHASE II

Hulu Ganga-Phase ll
Small Hydropower Project

The Second phase of Hulu Ganga, commissioned in 2006,  adds 3.0 MW of power to the national grid. ECLE , as  the EPC contractor, sourced, installed, tested and commissioned 2 Francis Hydro Turbine units and total electromechanical equipment package sourced from one of Europe’s leading brands for which ECLE is sole agent in Sri Lanka.

Checkout more projects

Taking our expertise and experience to (em)power communities overseas for the first time, this plant commissioned in Rwanda in 2011 generates  9.2 MW of power

 

A plant commissioned in 2011 adds 6.5 MW to the grid in Inhasha Uganda.

Ventured into Uganda for the first time with a 6.5 MW plant with EPC implemented and commissioned in 2011.

A Water to Wire initiative by ECLE in one of the remotest villages in Uganda; also operated and maintained by ECLE since 2019.

Commissioned in 2003, it uses the waters of Hulu Ganga

Utilising the waters of Magal river, the project generates

Located in a remote areas of the Uva province in Sri Lanka, it Generates 9.8 MW of power

3.0 MW mini hydro in Sri Lanka’s lush hill country with EPC  implemented by ECEL

ECLE implanted the EPC for this 1.0 MW power plant.

Another Water to Wire mini hydro designed, constructed as well as operated and maintained by  ECLE in Uganda.

A 2 MW mini hydro power plant in the highest mountain region of Sri Lanka

EECL implemented the EPC for this  1.1 MW mini hydro in Sri Lanka

Utilising the waters of river Walawe, the Mini Hydro generates 1.8 MW for which ECEL was implementer of the EPC contract.